Lincoln Golf Club Greens Reconstruction

Premier Turfing recently completed a major phase of work at Lincoln Golf Club, near Torksey. The project included Lincoln Golf Club greens reconstruction, with the reconstruction of the 9th and 10th greens as part of the club’s long-term improvement programme.

Golf course architect Ken Moodie of Creative Golf Design leads the wider project. His plans aim to restore more of the course’s heathland character while improving drainage, playability and long-term resilience.

This reconstruction formed one of the most significant phases completed so far.

Rebuilding the 9th and 10th Greens

The 9th and 10th greens had become increasingly difficult to manage during wet winter periods. Both greens sit in low-lying areas, close to the water table. As a result, the club regularly needed temporary greens during prolonged wet weather.

The project therefore focused on improving drainage and creating more reliable playing surfaces.

Our team reconstructed both green complexes to Ken Moodie’s design. We raised the greens and reshaped the surrounding areas to improve drainage and strengthen the overall character of each hole.

Improving Drainage and Playability

Drainage formed an important part of the Lincoln Golf Club reconstruction. New drainage systems helped create a more reliable foundation beneath the greens and surrounding areas.

At the same time, the revised contours added interest to the green complexes. The work aimed to improve performance without making the new greens feel out of character with the rest of the course.

Premier Turfing has extensive experience in specialist golf course services, including construction, remodelling and drainage.

We also provide specialist greens drainage for golf clubs throughout the UK.

Making Use of Existing Materials

Where possible, the project made use of suitable materials already available on site. This included sand and existing rootzone material from the original greens.

The original turf was also lifted and reused following reconstruction. This helped maintain consistency with the club’s established playing surfaces.

Using existing materials also reduced the need to introduce completely different growing media into the course.

Part of a Wider Course Improvement Programme

The Lincoln Golf Club reconstruction forms part of a much larger improvement programme. The club has already completed work to bunkers, trees, irrigation and other areas of the course.

The long-term aim is to strengthen the course’s heathland character while adapting it for modern golf and changing weather patterns.

The reconstructed greens were completed during winter 2025/26. They then established well ahead of reopening for play.

Working with Ken Moodie on Lincoln Golf Club Greens Reconstruction

Premier Turfing was pleased to work alongside Lincoln Golf Club and Ken Moodie on this phase of the project.

The reconstruction brought together drainage, earthworks, shaping and careful reinstatement. As a result, the finished greens now offer improved performance and greater resilience during wetter conditions.

The project was also featured by Golf Course Architecture, highlighting the wider course improvement programme and the work completed on the 9th and 10th greens.

For more information about Ken Moodie’s work, visit Creative Golf Design.